We use cookies to help make our website better.
At the moment, your preferences Click here if this is OK, otherwise click here to find out more.
cookies.How we use cookies
T: 01452 385435 E: info@ge-trust.org.uk
Providing grants from funds generated by the
Landfill Communities Fund for the benefit of Gloucestershire
The Gloucestershire Environmental Trust has funded a wide variety of capital projects since it began in 1997. Some of the most recent projects are listed below. Please use the filters to narrow down your search. You can also view our recent projects on a map.
NB We hope to upload a full archive of case studies during the forthcoming months.
Posted: 1st May 2015
A number of delivery drivers have been caught in Gloucestreshire driving without the correct insurance. Delivery drivers need to have a form of vehicle insurance called Hire and Reward cover which can be purchased from this insurance site. Hire and reward insurance is a form of insurance that covers drivers for carrying all kinds of goods from fast foods, parcels, or even heavy industrial deliveries.
Posted: 1st May 2015
Renovatation of the existing kitchen
Posted: 1st May 2015
Restoration of church bells of St Peter’s Church, Rodmarton
Posted: 1st May 2015
Refurbishment of community centre kitchen and fire alarm
Posted: 30th April 2015
Specialist plastering work to the interior of the church
Posted: 29th April 2015
Essential roof repairs to Oakridge Village Hall
Posted: 24th March 2015
Lighting renewal
Posted: 17th March 2015
Creation of a learning space, tool shed and recreation areas
Posted: 17th March 2015
Bank erosion works, fencing, a boardwalk and access platform
Posted: 17th March 2015
Opening up the terraced gardens at Woodchester Park
Posted: 16th March 2015
Installation of lighting and sound systems
Posted: 12th March 2015
Creation of a fully accessible 2.4km waymarked circular footpath around Gloucester’s Riverside Meadows
Posted: 13th October 2014
Modernisation of the church, including internal works and the installation of an outside toilet
Posted: 13th October 2014
External works including upgrading of the roof, external fabric and electrical infrastructure and refurbishment of the sash windows, flooring and benches.
Posted: 13th October 2014
Build of a new village hall on the existing footprint with a timber framed structure to replace 70 year old dilapidated building
Posted: 13th October 2014
Contribution towards solar panels
Posted: 13th October 2014
Contribution to Phase III of building works
Posted: 13th October 2014
Contribution towards refurbishment including new toilets, new flooring, wall insulation, kitchen and bar refurbishment, as well as new heating and water system
Posted: 13th October 2014
Modification of the Back Room from a drab storage space to a light and airy green room and classroom/ exhibition space
Posted: 13th October 2014
Contribution towards refurbishment works
Posted: 13th October 2014
Grant towards the completion of the first phase of renovation works to the church and community room
Posted: 13th October 2014
Repair and reconfiguration of Grade II listed building following flood damage
Posted: 13th October 2014
Funding for the protection and enhancement of the natural environment around the new boathouse
Posted: 13th October 2014
Ongoing and sensitive conservation of ancient woodland
Posted: 13th October 2014
Grant towards the cost of project materials, tools and equipment for biodiversity project
Posted: 13th October 2014
Grant towards extension of public amenities so that more schools, play groups and clubs can take advantage of the education and other facilities on offer
Posted: 13th October 2014
Grant to enable the identification, verification, labelling and production of the manual, guide and key to the entire National Collection
Posted: 13th October 2014
Grant towards re-roofing the flat roof annexes to the main hall which were particularly prone to leak in heavy rain
Posted: 13th October 2014
Grant towards re-thatching of hall roof and replacement gas boiler
Posted: 13th October 2014
Grant towards new 2 metre wide path of 620 metres in length
Posted: 13th October 2014
Essential building works to new village hall
Posted: 13th October 2014
Replacement of six missing opening gates, street furniture and planting of a garden and a hedge adjacent to the gateway
Posted: 13th October 2014
Grants awarded to produce a replica cockpit section of the Horsa assault glider and for the completion of landscaping at the museum premises
Posted: 13th October 2014
Conversion of an existing birdwatching hide into a new Discovery Hide at South Lake
Posted: 13th October 2014
Funding towards the second phase of the repair and rescue project of this Grade II listed building
Posted: 13th October 2014
Restoration of the Grade II listed table tomb, plus new signage and pathway at St Mary\'s Church, Berkeley
Posted: 13th October 2014
Restoration project including replacement of weathered stones, and repointing and replacement of four glass windows
Posted: 13th October 2014
Restoration of Grade I listed Gray & Davison church organ
Posted: 13th October 2014
Erection of new fencing
Posted: 13th October 2014
Installation of photovoltaic panels and a ground source heat pump
Posted: 15th May 2012
Installation of photovoltaic panels on the nave roof in association with a new energy plan
Posted: 15th May 2012
Installation of a new water and heating system
Posted: 15th May 2012
Contribution towards flood-proofing works
Posted: 15th May 2012
Building works to new entrance area
Posted: 15th May 2012
Construction of new village hall
Posted: 15th May 2012
Conversion of under-used space into multi-use area for adjacent school
Posted: 15th May 2012
Landscaping works
Posted: 15th May 2012
Building works to reduce the carbon footprint of the building and improve its sustainability
Posted: 15th May 2012
Remediation work following dry rot
Posted: 15th May 2012
Restoration of the Henry III Coronation window
Posted: 15th May 2012
New Spiral Feature within children\'s play area
Posted: 15th May 2012
New path
Posted: 20th December 2010
Eco-energy refurbishment
Posted: 20th December 2010
Erection of 180 bat boxes to search for, survey and monitor Bechstein and Barbestelle bats
Posted: 20th December 2010
Renovations of village hall
Posted: 20th December 2010
Refurbishment works to grounds
Posted: 20th December 2010
Structural repairs
Posted: 20th December 2010
Refurbishment project
Posted: 20th December 2010
Kitchen extension
Posted: 20th December 2010
Installation of double glazed windows, external wall insulation and rendering
Posted: 20th December 2010
Re-roofing project
Posted: 20th December 2010
Renovation works
Posted: 20th December 2010
Refurbishment programme
Posted: 20th December 2010
Dry stone walling project
Posted: 20th December 2010
New aviaries and quarantine
Posted: 20th December 2010
Factory renovation
Posted: 9th October 2010
Funding for the installation of a new stage
Posted: 9th October 2010
Funding towards a new car park, away from the environmentally sensitive Grade I registered downland
Posted: 9th October 2010
The creation of a new multi-use learning space (the \'Pavilion\') in the derelict walled garden that adjoins the Museum in the Park
Posted: 9th October 2010
Repairs to boundary wall
Posted: 9th October 2010
Restoration of two stage boxes
Posted: 9th October 2010
Restoration of 14th century church bell tower
Posted: 9th October 2010
Contribution towards construction of new sports hall
Posted: 9th October 2010
Repair of the two south facing elevations of the Cotswold Stone roof and replacement of window supports on north and west side
Posted: 9th October 2010
Installation of new suspended walkways
Posted: 9th October 2010
Repair work to stone built clapper bridge
Posted: 9th October 2010
Installation of two new cattle grids
Posted: 9th October 2010
Extensive improvement works, including new front door, removal of front canopy, new fascias and soffits and replacement of areas of flat roof
Posted: 9th October 2010
Installation of new electrics and plumbing
Posted: 9th October 2010
New toilet block, including disabled facility
Posted: 9th September 2010
Replacement of damaged lintels and pillars and the refurbishment of the former market area
Posted: 9th September 2010
Funds to enable completion of the first essential phase of the refurbishment project
Posted: 9th September 2010
Restoration of 10 hectares of precious ancient woodland
Posted: 8th June 2006
Improvement works to footpath around the top lake
Posted: 30th November 1999
Grant towards a discovery space at the museum